Author: Pradhumn

Shri Akhilesh Singh, Elevated to the post of HOP of NTPC Lara

Shri Akhilesh Singh, GM (Operation & Maintenance), NTPC Lara took charge of NTPC Lara station from Shri Diwakar Kaushik, ED on 11th January 2024. Earlier Shri Singh was delivering his service as the head of the operation and maintenance work of Lara station. As head of the project, he shall be responsible for all the activities […]

Read More

ONGC, NTPC to form joint venture for mega projects

Oil and Natural Gas Corporation Limited (ONGC) and NTPC ltd are planning to set up a Joint Venture Company for Renewable Energy business. The two Maharatnas entered into a Memorandum of Understanding (MoU) on 21 May 2020 in Delhi to formalize this arrangement. The MoU will enable both companies to achieve their targets in Renewable […]

Read More

Tata Power to install India’s first-of-its-kind underground submersible substation in Mumbai

Even the all-powerful Pointing has no control about the blind texts it is an almost unorthographic life One day however a small line of blind text by the name of Lorem Ipsum decided to leave for the far World of Grammar. The Big Oxmox advised her not to do so, because there were thousands of bad Commas, wild Question Marks and devious Semikoli, but the Little Blind Text didn’t listen.

Read More